| Demand137 | Whether to bid, and at what incentive level | A scenario range against a named rival, not a match-the-rival figure | The incentive ceiling is set before the negotiation, not during it |
| Demand137 | Which rival destinations are the real competition | Route, hotel capacity, and venue benchmarking against the specific shortlist | The bid message targets the constraint the rival cannot match |
| Demand137 | When hotel and venue capacity limits what can be bid for | Room supply and site evidence tied to the bid calendar | Dates and scale the destination can genuinely deliver |
| Demand137 | What matching the rival's offer would actually buy | Attributable value net of the incentive cost, position by position | Matching on price alone stops being the default |
| Demand137 | What happens if we sit this cycle out? | Base, downside, and supported scenarios with a stated counterfactual | The cost of walking away is priced alongside the cost of bidding |
| Signal137 | What did the congress we won deliver? | Delegate spend, room nights, GVA, tax, and jobs, attributed and net of displacement | The bureau reports to the funder against the case that backed the bid |
| Signal137 | Why did we lose the last one? | The same scenario comparison, run after the result | The next bid is sharpened rather than repeated |
| Signal137 | Which congresses in the calendar pay back, and which only fill the venue? | Every congress ranked on retained value, on one method | The bid calendar improves year on year |
| Signal137 | Can I have the number before the shortlist deadline? | Reports on demand, in minutes, not after the PCO has decided | Evidence arrives while the bid is still open |
| Both | Who holds this, and where? | Model, data, and a trained team inside your jurisdiction | The capability survives the change of director or bid team |