Tourism development feasibility study: build for the demand the place can sustain, not the peak it remembers.

A feasibility study usually sizes a scheme against the best year the site or a comparable ever had. That year happened once, for reasons that may not repeat: a one-off event, a currency swing, a route that has since been cut.
Test scale, unit mix, and phasing against demand across cycles, specific to the site's catchment and access. Release each phase when the market has absorbed the last one, and condition the go decision on the route, road, or venue the case assumes.

A tenth of the world's output and employment depends on the visitor economy

Living Lab’s first economic model was for the Singapore Grand Prix in 2012. In 2025 we became a software platform: government-grade intelligence for the visitor economy

In the last 12 months we have deployed at more than 700 events. They delivered 14 million room nights and over US$12bn in gross value added

What does Living Lab do for tourism development feasibility study?

Tourism development feasibility study. Living Lab connects the market report, transport study, planning constraints, and comparable set that a development team holds separately, around the site itself, and turns them into a scale and phasing range a design team can build to and a lender’s technical adviser can retrace to source. Reference data is published by the World Bank.

Attributes what a delivered phase or an opened property actually produced against the case that sized it: occupancy, rate, and absorption, with the driver named. Whether the strong season was the trend or the peak. Signal137 becomes the evidence for releasing the next phase, or for the investor who buys the asset once built.

Tests the scheme before design freeze: as-planned peak-year scale, sustained-demand scale, and phased release, each with the assumptions stated. Dependency on infrastructure not yet secured mapped and conditioned. Local capacity and pressure checked so the scale is one a planning committee can approve without special pleading. Demand137 gives the range, not the number the massing plan was built to hit.

ProductYour questionYou getWhat it changes
Demand137What scale can the site's demand genuinely sustain?Demand vectorised across several cycles, not the single peak year used to size the massing planUnit count, room count, or footprint set against a tested range
Demand137Which phase first, and how fast to release the next?A phased demand curve with the lead indicators that signal when a phase is readyPhasing sequenced against demand as it arrives, not a fixed construction calendar
Demand137Does the scheme depend on infrastructure not yet secured?The route, road, venue, or utility the demand case assumes, mapped and datedGo or no-go, or phasing, conditioned on the dependency being secured first
Demand137Can local capacity absorb the scheme without stalling consent?Labour, planning throughput, and existing visitor pressure in the catchmentA scale and phasing a planning committee can approve
Demand137What if the answer is a smaller or slower scheme than planned?The range shows it, with the assumptions statedA model built to always confirm the scheme is not evidence a lender should rely on
Signal137Did phase one absorb as the case said it would?Occupancy, rate, and absorption against the forecast, with the driver attributedPhase two released on evidence, not on the construction calendar
Signal137Was last season the trend, or the peak?The strong season separated from the underlying demand, per propertyThe next phase is sized to the trend
Signal137What did the opening do to the surrounding market?Displacement and new demand around the site, measuredThe cannibalisation question answered before the next release
BothCan this go into a planning application or a lender's technical report?Every scenario states its assumptions, counterfactual, and uncertainty rangeA planning officer or technical adviser can retrace it rather than take it on trust
BothDo you need our scheme financials or land agreements?No. Public and licensed market data plus the site, unit mix, and dependencies to be testedFinancial modelling built on the output stays with your own team

Size the scheme to the trend, not the peak

Calendar optimisation example

USE CASES

La Sagra

A tourism asset rarely fails on its growth story

A hotel, a resort, or a mixed-use scheme fails underwriting when a single route, a single annual event, or a single source market turns out to be carrying more of the demand case than the committee realised. The dependency is the risk, and it can be measured before signature.

Read More Ā»

A 100,000-seat stadium: build one less seat than you can sell

Manchester United’s proposed stadium is a Ā£2bn, 100,000-seat ground by Foster + Partners, with a target opening of 2030-31. The club and the regeneration case cite Ā£7.3bn a year for the economy and 92,000 jobs. Those are the promoters’ projections. Here is what to test before believing them.

Read More Ā»

Advancing the Tourism Industry

Show me the evidence

Tell us the question. We'll bring back the answer.

Come and show your working

We turn messy event and tourism data into decisions that help communities grow. Bring curiosity and rigour. We will hand you questions nobody has answered yet.