| Demand137 | What scale can the site's demand genuinely sustain? | Demand vectorised across several cycles, not the single peak year used to size the massing plan | Unit count, room count, or footprint set against a tested range |
| Demand137 | Which phase first, and how fast to release the next? | A phased demand curve with the lead indicators that signal when a phase is ready | Phasing sequenced against demand as it arrives, not a fixed construction calendar |
| Demand137 | Does the scheme depend on infrastructure not yet secured? | The route, road, venue, or utility the demand case assumes, mapped and dated | Go or no-go, or phasing, conditioned on the dependency being secured first |
| Demand137 | Can local capacity absorb the scheme without stalling consent? | Labour, planning throughput, and existing visitor pressure in the catchment | A scale and phasing a planning committee can approve |
| Demand137 | What if the answer is a smaller or slower scheme than planned? | The range shows it, with the assumptions stated | A model built to always confirm the scheme is not evidence a lender should rely on |
| Signal137 | Did phase one absorb as the case said it would? | Occupancy, rate, and absorption against the forecast, with the driver attributed | Phase two released on evidence, not on the construction calendar |
| Signal137 | Was last season the trend, or the peak? | The strong season separated from the underlying demand, per property | The next phase is sized to the trend |
| Signal137 | What did the opening do to the surrounding market? | Displacement and new demand around the site, measured | The cannibalisation question answered before the next release |
| Both | Can this go into a planning application or a lender's technical report? | Every scenario states its assumptions, counterfactual, and uncertainty range | A planning officer or technical adviser can retrace it rather than take it on trust |
| Both | Do you need our scheme financials or land agreements? | No. Public and licensed market data plus the site, unit mix, and dependencies to be tested | Financial modelling built on the output stays with your own team |