Sports mixed use development: the problem with every sports venue is the other 300 days

Quick Navigation

Built for the peak. Empty for the year: sports mixed use development

Sports mixed use development. A race track, an arena, a stadium: each is built for a peak it reaches a few dozen times a year. The gap between peak and off-peak operational need is the commercial challenge behind every sports-anchored development, and the reason mixed use is the answer rather than the fashion. Reference data is published by the World Bank.

A venue is sized for its biggest day. The stadium for the derby, the arena for the sold-out tour, the circuit for the Grand Prix. Everything about it, from the seats to the concourses to the car parks, is specified for a load it carries a few dozen times a year.

On every other day, the same asset carries almost nothing, and it still has to be cleaned, insured, heated, and staffed. That is the gap between peak and off-peak operational need, and it is the fundamental commercial problem of sports infrastructure.

Built for the peak

The answer that has emerged over the last two decades is to surround the venue with uses that carry demand on the days it does not: homes, offices, hotels, retail, a smaller venue for the nights the big one is dark. The venue supplies the peak-day footfall; the district supplies the base load.

Done well, the two subsidise each other. The venue’s event nights give the district retail its best trading days, and the district’s residents and workers give the venue’s surroundings life on the days there is no match.

The gap between peak and off-peak operational need means sports infrastructure faces a fundamental commercial challenge.

Why mixed use

Done badly, mixed use is a stadium with some flats attached. The homes are sold on the view, the retail is leased on the matchday footfall, and the first quiet winter closes the shops. The mistake is always the same: the case was built on the peak, because the peak is the number that looks good in the brochure.

Done badly

The demand on the off-peak days, by source. Residents, workers, hotel guests, and visitors to the smaller venue, each with a number and an assumption behind it.

The conversion from event attendance to district spend. Attendance is not footfall in a shop. Dwell time before and after the event, and the share who stay, are measurable, and they are usually smaller than the brochure assumes.

The phasing. Which use opens first, and whether it can carry the district until the next one opens. A hotel that opens before the homes and the offices is a hotel with a matchday problem.

Prove the dark nights

Mixed use is not a style. It is the arithmetic of a venue that would otherwise be empty for most of the year. The developments that work are the ones where the off-peak demand was proven first and the venue was fitted to it, not the other way round.

The method is on the pages for developers and venue, location, and site strategy.

For further reading, see OECD Tourism Trends and Policies 2024.

Actionable takeaways

Before financing a venue-anchored scheme, ask for the demand case with the venue removed. If the district cannot stand on the off-peak days, the venue is not anchoring it. It is hiding it.

La Sagra

A tourism asset rarely fails on its growth story

A hotel, a resort, or a mixed-use scheme fails underwriting when a single route, a single annual event, or a single source market turns out to be carrying more of the demand case than the committee realised. The dependency is the risk, and it can be measured before signature.

Read More Ā»

A 100,000-seat stadium: build one less seat than you can sell

Manchester United’s proposed stadium is a Ā£2bn, 100,000-seat ground by Foster + Partners, with a target opening of 2030-31. The club and the regeneration case cite Ā£7.3bn a year for the economy and 92,000 jobs. Those are the promoters’ projections. Here is what to test before believing them.

Read More Ā»

Show me the evidence

Tell us the question. We'll bring back the answer.

USE CASES

Advancing the Tourism Industry